TERRANES

What status reporting costs you

The hours your people spend chasing status, assembling it and re-explaining it — times how many of them, times what an hour costs. Your numbers only. No benchmark, no industry multiplier, nothing pre-filled, and every figure on the result traces back to something you typed.

The people who assemble status

Project leads, project managers, anyone whose Thursday is spent finding out where things stand and writing it down.

Required.

Required.

The people who supply it

Engineers, buyers, site leads — the ones who get asked, look it up, and answer. Leave it at zero if you only want the leads' side.

What an hour costs

Fully loaded — salary plus employer costs plus overhead, divided by billable hours — not the salary rate. If you do not have it, your finance person does.

Required.

Blank means 52. Enter your own if you want holidays taken out.

Optional — only used to show the cost per project.

The result, as you type
Per year
Per week
Hours per week, all together
Per person per year

Arithmetic only: (leads × their hours + contributors × their hours) × weeks × rate. There is no coefficient in it, and nothing we chose.

The document is built in your browser. It is sent to us only if you ask us to send it — below, after it exists. A draft is kept in this browser only; use Save draft to carry it to another machine.